案例1德克萨斯海湾沿岸工业垃圾填埋场

出现之前的水平井筒技术,垂直井是用来恢复受污染的地下水在垃圾填埋场。与高含水层渗透系数、垂直井放置在垃圾填埋场的边缘可以影响垃圾填埋场的土层。如果羽毛的尺寸很小垃圾场的规模相比,从污染物的迁移羽在垃圾填埋场的核心沿着边缘垂直抽油井污染传播。低渗透系数需要放置垃圾填埋场内的垂直井、渗透垃圾填埋场衬垫。长期密封衬垫的垂直井管不能得到保证。水平井避免这些问题将直接生产屏幕羽没有渗透垃圾填埋场。

1991年,水平井是安装在一个《设施在德克萨斯海湾恢复被污染的地下水。垃圾填埋场占地面积大约900英尺到900英尺。它的深度是30英尺,而其两侧的斜率27°水平(图3)。数值模拟在安装之前预测,单一水平井hy -

GRAY-TAN粉质粘土

红褐色粘土

红褐色粘土

灰色的粘土

•-i-i-i-i-i-i我••我i-i-i-i-i-i——«-i-i-i-i-r ~ ir ~ i-i-i -»-i-r - > - t -»-i-r-i-i-i - >

50 100 150 200 250 300 350 0

细沙

灰色的粘土

•-i-i-i-i-i-i我••我i-i-i-i-i-i——«-i-i-i-i-r ~ ir ~ i-i-i -»-i-r - > - t -»-i-r-i-i-i - >

50 100 150 200 250 300 350 0

图3德克萨斯海湾沿岸landfill-cross部分与水平井路径。

GRAY-TAN粉质粘土

红褐色粘土

红褐色粘土

细沙

draulically更有效率比垂直井系统[18]。单一水平井取代五井垂直复苏。减少泵和较低的回收水体积保存修复系统的操作和维护成本。

1。水文地质

层间的,20 - 30 ft-thick红褐色粘土和灰色和褐色粉或砂质粘土描述地下从0到98英尺的深度,对应于26英尺平均海平面以上(韩剧)到72英尺以下的火星科学实验室(图3)。至上粉质粘土层和底层的红褐色粘土层被发掘适应填埋。谭细沙从表面发生在100 - 128英尺的深度,或70 - 95英尺以下的垃圾填埋场的基础。蓝灰色和黑灰色粘土构成。粉砂质或砂质粘土层和砂层饱和。红褐色粘土隔水层或如何。谭砂层是修复的目标努力。液压电导率、钾沙子是30英尺/天,stora-tivity,年代,1 X的纯,指示性的承压含水层。没有明显的电位梯度泵的缺失。

2。良好的规范

——60英尺的6%。开槽不锈钢丝网安装在垃圾填埋场总垂直深度114英尺。这个深度是4.7英尺以下的含水层数,给油井的井口突出4.7英尺的怪癖。41.5°角,20英尺的垃圾填埋场。水平位移从井口到开始屏幕的248英尺,反映出曲率半径的275英尺的弯曲部分与10——下套管。高密度聚乙烯衬垫隔离土壤区在钻井和提供结构支撑内心的不锈钢外壳。

3所示。钻井过程

钻井开始与16的螺旋钻法。井筒测量深度的37英尺,对应的弯曲部分井筒的开始点。钢套管、14。公称直径,巩固了在16。井筒。水泥被允许为12小时。曲线钻井组装然后钻,同时包装13。钻孔与一个有效的钻井275英尺半径测量深度272英尺。弯曲部分是使用13日在钻。翼。高密度聚乙烯套管10。 thick was then cemented into the curved section of the wellbore. After the cement had set, the horizontal drilling assembly drilled an 83/4-in. wellbore to a measured depth of 352 ft, with a final inclination of 90.5° from vertical. The horizontal section was drilled using an 83/4-in. rock bit. Schedule 40, 316 SS ERW stainless screen casing, with 65/s-in. outer diameter, was installed along the entire length of the wellbore. Only the 60-ft section of stainless steel casing installed within the target zone was slotted. Slot size was 0.02 in. TWenty-foot sections of stainless steel casing were welded together, increasing installation time. Six 10-ft sections of prepacked screen were installed inside the stainless steel screen in the target zone. The prepacked screen was attached directly to an electric submersible pump oriented horizontally within the unscreened stainless steel casing. Well development required 18 hr, after which clear water was recovered. Residual drilling fluids were flushed out of the well with a submersible water jetting tool.

钻井、安装和开发需要大约10天。钻井期间,连续更新的倾向和工具面取向提供,以确保适当的井筒位置。TruTracker调查是根据需要,至少每隔20英尺,提供实际钻头位置对该路径方向。水平井筒内保持4英尺垂直目标区间,因此超过所需的精度±5英尺(图3)。也仍然在20-ft-wide水平目标区(图4)。大约18000加仑的岩屑,钻井液,大调的生成,和水泥的回报

0 50 100 150 200 250 300

0 50 100 150 200 250 300

图4德克萨斯海湾沿岸landfill-plan水平井的路径。

荷兰国际集团(ing)的安装水平。将近一半的体积是在安装过程中产生的弯曲部分。

4所示。好性能

油井生产7流量的水,创造减少1 - 2英尺的距离高达300英尺的径向的中点。创建的撤军水平井是一致的分析建模的结果如图5所示(距离给出了脚,等高线间距是0.1英尺)。模型假定稳态流均匀,各向同性的蓄水层。不到100英尺,等势面定义了一个椭圆

模具弗洛雷斯Papel
图5德克萨斯海湾沿岸landfill-horizontal撤军等值线图。

抑郁症的槽。在100英尺之外,等势面轮廓是圆形的。模型表明,下降沿的泵送率是2.7英尺7流量。

水平井的比容量相对垂直的只有1.16倍与完全穿透屏幕。因此,水平井的主要优势不是液压,但后勤。渗透现有垃圾填埋场衬垫,所涉及的风险,需要对垂直安装在这个场景中,大于成本差异。

继续阅读:流图和物质平衡

这篇文章有用吗?

0 0